Scupper 159

Boat:

Sea Breeze (FKA Scupper), a 1978 Legnos Mystic 30' Cutter

Schedule:

This project was completed in several phases over two years to meet the owner’s schedule.

Initial Pre-Project Inspection Report and Observations

Early Phase:  Hardware removal and early assessment
September 2017
Early Phase Hours:  26.75

Phase 1: Dismantling, surface prep, systems removal, repairs, structural work
March 16, 2018 – November 16, 2018 (Discontinuous)
Phase 1 Hours:  315

Phase 2: Interior, systems, and more
January 23, 2019 – June 21, 2019
Phase 2 Hours:  665.5

Phase 3:  Electrical, electric motor, plumbing,  final exterior finishing, and everything else
October 18, 2019 – March 27, 2020
Phase 3 Hours:  683.75

Scope of Project:  Comprehensive refit, including deck repairs, repower, interior makeover, hull work, and systems

Project Complete:  1691 Total Hours

 

Begin Daily Project Logs

Alternately, click the button below to navigate to a specific log.

June 19, 2019

Scupper 159

Wednesday

With the interior work and this phase of the project winding down, it was a good time to start work on the cabin table, which required refinishing.  The original table, which I removed early in the project, was heavily built of (I think) teak, and while it was in generally good condition, the finish wasn’t quite good enough to consider simply sanding and varnishing, with various nicks and scrapes that would have marred such an attempt.

To begin, I disassembled the table, removing the two drop leaves and their support systems, along with any hardware.  This left me with a series of manageable pieces.

I stripped the old varnish with a heat gun and scraper in the usual way and set the pieces aside for later sanding, cleanup, and eventual varnish.

Total time billed on this job today:   3.5 hours

0600 Weather Observation:  60°, foggy.  Forecast for the day:  Fog, then becoming sunny, 71°