Scupper 66

Boat:

Sea Breeze (FKA Scupper), a 1978 Legnos Mystic 30' Cutter

Schedule:

This project was completed in several phases over two years to meet the owner’s schedule.

Initial Pre-Project Inspection Report and Observations

Early Phase:  Hardware removal and early assessment
September 2017
Early Phase Hours:  26.75

Phase 1: Dismantling, surface prep, systems removal, repairs, structural work
March 16, 2018 – November 16, 2018 (Discontinuous)
Phase 1 Hours:  315

Phase 2: Interior, systems, and more
January 23, 2019 – June 21, 2019
Phase 2 Hours:  665.5

Phase 3:  Electrical, electric motor, plumbing,  final exterior finishing, and everything else
October 18, 2019 – March 27, 2020
Phase 3 Hours:  683.75

Scope of Project:  Comprehensive refit, including deck repairs, repower, interior makeover, hull work, and systems

Project Complete:  1691 Total Hours

 

Begin Daily Project Logs

Alternately, click the button below to navigate to a specific log.

January 25, 2019

Scupper 66

Friday

In the forward cabin, I removed the tall hanging lockers at the aft end of each berth.  I used a saw to cut along the intersection of these lockers with the sides of the v-berth liner, and along the edge of the berth top, leaving a bit of an edge that I’d clean up and make flush later with additional sanding.  I cut out the lockers in a few sections to keep the size manageable, and removed remnants of the old tabbing along the hull sides to finish up the removal for now.

Removing the lockers greatly opened up and enhanced the space, and allowed decent access to the inside of the hull and forwardmost chainplate locations, and would greatly streamline further work efforts in the near future.  For now, I wasn’t sure how the owner wanted to finish off the space, but we’d discuss it during an upcoming meeting at the boat.  I’d soon clean up the areas with additional sanding, but for right now I planned to focus the rest of the day in the main cabin.

I turned back to the lockers beneath the settees, particularly on the port side, where I removed the rest of the core from the area with a grinder; I’d tried prying and scraping it, but found it too time-consuming.  With one remaining sanding disc on the grinder, I ground away the remaining square foot or so of core, and lightly cleaned up the lockers on both sides.  There was more and better sanding still to come soon, but I needed a new supply of the sanding discs first.

The main cabin largely consisted of molded, gelcoated interior components and liners, including the galley, settees and backrests, and the overhead, and the original finishes were old, tired, and stained.  On the port side, where work had been done in the past by others, there was some nasty glossy white paint filled with bubbles and roller stipple.  (Note:  lots of additional photos of the interior in various stages of disassembly and “as-arrived” condition can be found in the early pages of this project.)

During the remainder of the day, I sanded all the gelcoated surfaces in the main cabin and galley, removing gloss from the gelcoat and, where necessary, removing that nasty old paint.  This included all areas of the settees and backrests, the galley and companionway areas, the underside of the bridgedeck, and the undersides of the sidedecks.  This initial round of sanding was a sort of initial cleaning pass, and I planned additional finish sanding soon to take care of final surface prep for primer as well as deal with detail areas and corners.  The large bulkhead aft of the galley was still covered with well-stuck Formica and didn’t receive any attention at this time.  In some areas, I had to remove hated silicone sealant residue, which the builders had used beneath some of the trim and around the large port above the galley.    It was like sanding a car tire, but I prevailed.

The molded overhead was pockmarked with holes from hardware installations above, as well as a nightmare area above the galley where various old work had occurred.  This overhead was never going to be the final surface in the new interior, but I felt it was still necessary to sand it with coarse paper to clean, degloss, and abrade the surface so it would be ready for whatever future treatments I might do.

The overhead was also too ugly to live, and after all, I had to work in this space for some months.  A happy boat restorer is…well, happy.  It just felt better in the boat after I’d sanded the overhead clean.

I cleaned up the dust and detritus from the past two days’ sanding, and looked forward to repeating the process in the forward cabin next time.

Total time billed on this job today:  7 hours

0600 Weather Observation:  30°, clear.  Forecast for the day:  Increasing clouds, 32°