Calliope Girl 37

Boat:

Calliope Girl, an S&S 34' Sloop

Schedule:

October 2023 – May 2024

Project Scope:  Rebuild interior to incorporate various changes

Project Complete:  843 Total Hours

Begin Daily Project Logs

January 6, 2024

Calliope Girl 37

Saturday

With a pile of rough teak in my way in the shop, I decided to get a head start on planing and dimensioning.  During the morning, I planed 11 boards (various widths and lengths) down to the finished 3/4″ thickness, and straightened one edge to prepare for final dimensioning into whatever trim parts I needed as the project continued.  I still had several boards to go, but but the planer blades needed to be changed out so I left that for next time, when I’d also finish up the last three boards.

Total time billed on this job today: 3 hours

0600 Weather Observation: 26°, overcast, snow shower. Forecast for the day: Mostly cloudy, 26°