Calliope Girl 126

Boat:

Calliope Girl, an S&S 34' Sloop

Schedule:

October 2023 – May 2024

Project Scope:  Rebuild interior to incorporate various changes

Project Complete:  843 Total Hours

Begin Daily Project Logs

May 20, 2024

Calliope Girl 126

Monday

The project was winding down, but I had a few odds and ends remaining to finish up, starting with the chainlocker hatch, which I’d build simply from plywood and painted.  I contemplated ways to install some teak trim, but the pre-made and pre-finished pieces I had available weren’t really suitable, and I decided less was more with this hatch.

Next, I installed a sea rail in front of the galley range, ensuring it remained clear of the stove as it gimballed.

I reinstalled the hardware, then installed the hanging locker door after first removing my tools and supplied that I’d stored within.  For access to the hinges, which required the door be open, I had to remove the three inner pieces of the mast enclosure, which I’d planned to do anyway; I set those aside in the v-berth.  Then, I installed the door to enclose the head, unchanged from arrival.

 

Total time billed on this job today: 4 hours

0600 Weather Observation: 53°, partly cloudy. Forecast for the day: Mostly sunny, 71°