Lyra 46

Boat:

Lyra, a 1960 Pearson Triton

Schedule:

Project Schedule:  January 2021 – May 2021

Project Scope:  Interior work; deck hardware; cockpit repairs and refinishing; electrical work; electric motor installation; miscellaneous

Project Complete:  366 Total Hours

Lyra will be back in fall 2021 for Phase 2 of the project.

Begin Daily Project Logs

March 25, 2021

Lyra 46

Thursday

I spent the first part of the day sanding the cockpit once more, this time with 320 grit paper by machine and hand as required to ready the primer for the next steps.

Afterwards, I cleaned the boat and shop thoroughly and, since it was too soon to start masking over the primer for the topcoat (the last coat of primer had only been applied during mid-afternoon the day before and required 24 hours minimum cure time), I laid out and prepared masking materials for next time, when I hoped to mask, then apply topcoat to, the cockpit.

Total time billed on this job today:  2.75 hours

0600 Weather Observation:  44°, foggy.  Forecast for the day:   Mostly cloudy,  56°