November 2, 2015
Aventura 21
Monday
Spread out in and between a few other smaller jobs around the shop, I finished up the final preparations for high-build primer, beginning with washing down the floor and staging, then performing a final solvent wash of hull and deck with the coatings manufacturer’s proprietary solvent designed for the purpose.
Afterwards, I prepared the paint and spray equipment for the work ahead.
Total time billed on this job today: 2.75 hours
0600 Weather Report:
Clear, 40°. Forecast for the day: Mostly sunny, 50s.