November 6, 2015
Aventura 25
Friday
To begin, I lightly sanded the areas I’d filled earlier, removing the excess filler and completing the minor fine-tuning of the surface. With that complete, my focus shifted once more to cleaning chores to prepare for finish primer. I blew down, swept, vacuumed and solvent-washed the hull and deck, washed the shop floor, and ended with a final solvent-wash of the boat before preparing product and equipment for the priming job ahead.
Total time billed on this job today: 4 hours
0600 Weather Report:
Cloudy, 45°. Forecast for the day: Fog and clouds, about 65°