Halcyon 39

Boat:

Halcyon,  Sailmaster 22 Sloop #128

Schedule:

Project Complete:  294.5 Total hours

Scope of Project:   Full restoration, including deck refinishing and repair; interior refinishing; new electrical and systems; rigging inspection; brightwork maintenance

Begin Daily Project Logs

February 22, 2017

Halcyon 39

< Back to Halcyon

Wednesday

After final preparations, I applied a coat of semi-gloss white enamel to the interior surfaces.

In the woodshop, I continued work on the various loose pieces of trim and cabin sole, cleaning up and sanding the areas I’d repaired, and sanding clean all the other pieces to remove or otherwise prepare the old finish. Where the existing finish was sound, I simply sanded lightly to accept new finish coats.  I had to make another repair or two to the cabin sole and one of the veneered panels from the head area, so I’d await their completion before I started varnish work.

Total time billed on this job today:  7 hours

0600 Weather Observation:
34°, cloudy.  Forecast for the day: clouds and sun, 44°