Halcyon 31

Boat:

Halcyon,  Sailmaster 22 Sloop #128

Schedule:

Project Complete:  294.5 Total hours

Scope of Project:   Full restoration, including deck refinishing and repair; interior refinishing; new electrical and systems; rigging inspection; brightwork maintenance

Begin Daily Project Logs

February 13, 2017

Halcyon 31

< Back to Halcyon

Monday

Starting in the cockpit, and moving outboard, I lightly sanded the fresh primer by hand and machine, smoothing the surface and preparing it for the next steps.  Afterwards, I vacuumed up the dust and performed an initial solvent wash to clean the surfaces for the next stage of masking.

Normally, I’d have continued work, but with heavy snowfall outside I had to turn my attention to plowing staying ahead of the snowfall rates.

Total time billed on this job today:  3.5 hours

0600 Weather Observation:
20°, heavy snow, maybe 10-12″ since inception.    Forecast for the day:  snow all day, very heavy all morning and into the afternoon.