Halcyon 30

Boat:

Halcyon,  Sailmaster 22 Sloop #128

Schedule:

Project Complete:  294.5 Total hours

Scope of Project:   Full restoration, including deck refinishing and repair; interior refinishing; new electrical and systems; rigging inspection; brightwork maintenance

Begin Daily Project Logs

February 12, 2017

Halcyon 30

< Back to Halcyon

Sunday

With a major winter storm predicted for Sunday night and Monday, I changed my painting plans a bit and chose to spray the finish primer coats on Sunday morning instead of Monday, rather than run the risk of losing power at some critical moment during the storm on Monday, as well as to keep my schedule more or less on track.  Even ignoring the sensationalistic hype surrounding the snowstorm, it looked to be significant, and windy, and during the height of the storm wouldn’t be the ideal time to be in the middle of spraying.

So, after final preparations and tack-off, I applied three sprayed coats of epoxy-based finish primer to the deck areas.

Total time billed on this job today:  4 hours

0600 Weather Observation:
12°, cloudy, 4-5″ light, fluffy snow yesterday and overnight.  Forecast for the day:  heavy snow late, overnight, and Monday, 18-24″ predicted