Halcyon 60

Boat:

Halcyon,  Sailmaster 22 Sloop #128

Schedule:

Project Complete:  294.5 Total hours

Scope of Project:   Full restoration, including deck refinishing and repair; interior refinishing; new electrical and systems; rigging inspection; brightwork maintenance

Begin Daily Project Logs

March 28, 2017

Halcyon 60

< Back to Halcyon

Tuesday

The old boottop was looking pretty old, and I’d noticed while I painted the bottom earlier that it could use a freshening, so I masked it off and, after some basic preparation, applied a fresh coat of white paint. over the existing coatings.

Later, after sanding and cleanup, I applied a second maintenance coat of varnish to the mast and boom.

Total time billed on this job today:  1.5 hours

0600 Weather Observation:
32°, cloudy.  Forecast for the day:  cloudy, rain showers later.