Halcyon 54

Boat:

Halcyon,  Sailmaster 22 Sloop #128

Schedule:

Project Complete:  294.5 Total hours

Scope of Project:   Full restoration, including deck refinishing and repair; interior refinishing; new electrical and systems; rigging inspection; brightwork maintenance

Begin Daily Project Logs

March 15, 2017

Halcyon 54

< Back to Halcyon

Wednesday

Missing some packages I’d ordered earlier in the week–delayed, apparently, by the wintry weather the day before–I couldn’t finish up the electrical system as I’d hoped, but with the panel on hand and the new enclosure complete, I proceeded as far as I could, making up the positive connections to the panel and preparing the negative wires for their ultimate connection to a buss bar, which was on order and slightly delayed.  I’d finish up the final connections as soon as the missing part arrived.

Meanwhile, I made some final advance preparations for installing the deadlights next time.

Total time billed on this job today:  2.5 hours

0600 Weather Observation:
30°, partly cloudy, about 16″ new snow and some ice from overnight.  Forecast for the day:  sun and clouds, 32