Halcyon 29

Boat:

Halcyon,  Sailmaster 22 Sloop #128

Schedule:

Project Complete:  294.5 Total hours

Scope of Project:   Full restoration, including deck refinishing and repair; interior refinishing; new electrical and systems; rigging inspection; brightwork maintenance

Begin Daily Project Logs

February 9, 2017

Halcyon 29

< Back to Halcyon

Thursday

The fine fairing compound had cured overnight, and now I sanded the decks again, concentrating on the areas I’d filled and touching up elsewhere as needed.  Afterwards, I did the cleanup rounds, preparing the boat and shop for the next round of primer, along with sundry tasks like repairing a few areas where the masking tape had been damaged by the sanding.

Total time billed on this job today:  5.75 hours

0600 Weather Observation:
22°, cloudy.  Forecast for the day:  snow, 8″ or so predicted