April 7, 2017
Acadia 71
Wednesday, Thursday, Friday
Over a few days, I wrapped up the varnish work on the second side of the v-berth door.
Third coat:
Fourth coat:
Fifth coat (rubbed-effect satin):
Total time billed on this job today: 1 hour
Acadia, 1979 Sabre 34
September 2016 – December 2016
Begin Daily Project Logs
Alternately, click the button below to navigate to a specific log.
Wednesday, Thursday, Friday
Over a few days, I wrapped up the varnish work on the second side of the v-berth door.
Third coat:
Fourth coat:
Fifth coat (rubbed-effect satin):
Total time billed on this job today: 1 hour