Begin Daily Project Logs

December 5, 2016

Acadia 50

< Back to Acadia

Monday

After a careful sanding and cleanup in the cabin, I applied a coat of rubbed-effect satin varnish to the interior trim and bulkheads, what I hoped would be the final coat required, though I’d assess it later once the varnish had fully cured.  This time around, I applied the satin varnish to the inner companionway trim and the engine hatch/countertop trim, which had been in good shape to begin with and only required a light sanding before the final coat of satin varnish.

Afterwards, I sanded and cleaned all the small parts and trim, and applied the third coat of gloss base varnish to these pieces.

Total time billed on this job today:  7 hours

0600 Weather Observation:
20°. cloudy.  Forecast for the day:  clouds, light snow, 1-3″ expected.