Acadia 73

Boat:

Acadia, 1979 Sabre 34

Schedule:

September 2016 – December 2016

Begin Daily Project Logs

May 2, 2017

Acadia 73

< Back to Acadia

Tuesday

Finishing off the interior work were a few final touches from the upholstery contractor, including curtains on the cabin windows, a curtain to hang and close off the passageway by the head, and two filler cushions designed to fit in the convertible starboard settee in the saloon (one of which stored against the hull in the quarterberth; the other as a small backrest on the port settee), as well as some throw pillows in a coordinating fabric.

0600 Weather Report:
42°, cloudy.  Forecast for the day:  mostly cloudy, drizzle, and a shower, 50s