Acadia 68

Boat:

Acadia, 1979 Sabre 34

Schedule:

September 2016 – December 2016

Begin Daily Project Logs

March 31, 2017

Acadia 68

< Back to Acadia

Friday

It was tough to come up with flowery prose to describe such a simple set of tasks on this day, so I thought I’d  try a simple list:

1.  Lightly sand the fresh paint in the cabin

2.  Clean up

3.  Apply second coat of semi-gloss enamel.

4.  Watch paint dry.

Total time billed on this job today:  1 hour

0600 Weather Observation:
23°, mostly clear.  Forecast for the day:  sun and clouds, 40.