Acadia 61

Boat:

Acadia, 1979 Sabre 34

Schedule:

September 2016 – December 2016

Begin Daily Project Logs

March 22, 2017

Acadia 61

< Back to Acadia

Wednesday

After a light sanding and final preparations, I continued the new varnish work in the cabin with coat #2.

Back in the shop, I sanded the  teak base trim, drawer fronts, cabinet doors, and the head and forward cabin doors through the grits to clean and prepare the newly-stripped surfaces for varnish.

After cleaning up the wood and shop, I applied a sealer coat of varnish to all pieces.

Total time billed on this job today:  4.25 hours

0600 Weather Observation:
30°, clear.  Forecast for the day:  getting colder, clear, windy.