Acadia 57

Boat:

Acadia, 1979 Sabre 34

Schedule:

September 2016 – December 2016

Begin Daily Project Logs

December 16, 2016

Acadia 57

< Back to Acadia

Friday

I took a day off from the project to give the freshly-varnished cabin sole plenty of cure time before getting to work on finishing up and reassembling the cabin.  Now, I began by reinstalling the cabin sole base trim around the perimeter of the main cabin.

Next, I reinstalled the bookshelf, bulkhead lamps, and clock on the forward bulkheads, after which I returned to their original locations all the various books, hardware, galley equipment, and other loose gear that I’d removed before beginning the interior refinishing.

One small final item was to install two new louvered covers for insides of the Dorade vents over the raw holes in the overhead:  one in the passageway, and the other in the head.

The only job still on my list at this point was to install the new liner in the quarterberth, which I’d finish up as soon as the new materials were on hand.

Total time billed on this job today:  5 hours

0600 Weather Observation:
-5°, clear, windy.  Forecast for the day:  clear and windy, 8°