Acadia 53

Boat:

Acadia, 1979 Sabre 34

Schedule:

September 2016 – December 2016

Begin Daily Project Logs

December 9, 2016

Acadia 53

< Back to Acadia

Friday

After a light sanding with 320 grit–mainly to scuff the surface–and the  usual cleanup process, I applied a second coat of white semi-gloss enamel to the interior surfaces so treated.

Most of the small parts and trim looked good after my coat of satin varnish, but there were a few pieces with a holiday–it happens–or drips from the finger holes, so for these several pieces I lightly sanded and applied a new coat of satin varnish.

Total time billed on this job today:  3 hours

0600 Weather Observation:
27°, partly clear with a snow shower.  Forecast for the day:  partly sunny, 30.