Danusia 10

Boat:

Danusia, Cape Dory 31

Schedule:

Project Complete:  234.5 Total Hours

Scope of Project:  Brightwork refinish; cabin sole refinish; miscellaneous maintenance, upgrades, and repairs

Begin Daily Project Logs

January 6, 2016

Danusia 10

< Back to Danusia

Wednesday

Picking up where I left off, I continued stripping the brightwork on the port side, finishing up the outboard side of the coaming and the eyebrow trim and handrail on the cabin.

I moved my operation from the staging to the deck itself so I could continue with the remaining brightwork on the cabin top and inside the cockpit.  As with all the other wood, this woodwork was in basically good condition beneath old and weathered layers of Cetol.

During the rest of the day, I removed the old finish from these remaining areas, completing the raw stripping work on deck.  A few removable pieces, such as the swashboards and cockpit table, remained to be done, but I could do those on the bench anytime.

Total time billed on this job today:  7.5 hours

0600 Weather Report:
0°, clear.  Forecast for the day:  Sunny, temperature rising to the low 30s