Dharma Rose 1

Boat:

Dharma Rose, 1984 Contessa 26 (JJ Taylor)

Schedule:

November 2018 – January 2019

Scope of Project:   Repower; install Monitor windvane; repurpose keel-mounted holding tank; miscellaneous upgrades

Project Complete:  219.75 Total Hours

Begin Daily Project Logs

November 20, 2018

Dharma Rose 1

Tuesday

Earlier, I moved the boat indoors; she had her own trailer, making this move, and future moving needs, quite convenient.  There was a bit of snow on deck from a storm a few days earlier, so I left the boat overnight to melt off before getting down to business.

The first thing to do was to remove the mast from its deck storage position, which I did with my gantry.  I stored the mast outdoors, where my rigging contractor would soon be able to access it for rigging replacement and other work as needed.

She was a little askew on the trailer, angled slightly fore and aft and listing to starboard, so I spent a little time straightening her up and leveling the boat side to side.    The project would begin in earnest after the holiday weekend.

Total time billed on this job today:  1.5 hours

0600 Weather Observation:  31°, cloudy, maybe a snowflake.  Forecast for the day:  Snow, 3-6″ expected