Lively Heels Phase 3-21

Boat:

Lively Heels, a 1976 Fisher 30

Schedule:

Project Schedule:  November 2020 – April 2021

Project Scope:  Reconfigure and simplify engine-based heating system; install woodstove for cabin heating; remove sanitation treatment system and replace with holding tank, conceive and build deck storage boxes; miscellaneous and sundry small projects

Project Complete:  145.75 Total Hours

Begin Daily Project Logs

February 16, 2021

Lively Heels Phase 3-21

Monday

In a short work session, I finish-sanded the main deck box, smoothing the light 4th coat of fairing filler and pretty much completing the exterior prep work for this box.  There’d be additional worn ahead to prepare the interior, to install “feet” on the bottom that would support the box on deck, and to build a lid, before getting to priming and painting.

Meanwhile, I lightly sanded the tabbing on the new cockpit box, smoothing rough edges and preparing it for future steps.

Total time billed on this job today:  .5 hours

0600 Weather Observation:  15°, clear.  Forecast for the day:   Becoming cloudy, snow at night, 30°