Project Schedule:  November 2020 – April 2021

Project Scope:  Reconfigure and simplify engine-based heating system; install woodstove for cabin heating; remove sanitation treatment system and replace with holding tank, conceive and build deck storage boxes; miscellaneous and sundry small projects

Project Complete:  145.75 Total Hours

Begin Daily Project Logs

April 23, 2021

Lively Heels Phase 3-45

Friday

With the project at an end, and great weather that had continued for several weeks–and looked to continue more or less going forward–it was time to move Lively Heels back outdoors, where her owner could take care of his annual commissioning tasks before the boat was picked up here in a couple more weeks.

Total time billed on this job today:  1.5 hours

0600 Weather Observation:  35°, mostly cloudy.   Forecast for the day:   Sunny and windy, 56°