January 15, 2021
Arietta 32
Friday
With the new hasp now on hand, I completed the installation on the lazarette hatch. The hasp featured a rotating eye that secured the hasp without need for a padlock through the eye.
The final installation, as it were, was to reinstall the tiller, and with that, the project was complete, other than painting the bottom sometime in the early spring.
Total time billed on this job today: 0.5 hours
0600 Weather Observation: 32°, cloudy. Forecast for the day: Becoming sunny, 37°