Further 93

Boat:

Further, a 1975 Ericson 35

Schedule:

Project Schedule:  December 2022 – May 2023

Project Scope: Hull and deck paint, structural repairs, and miscellany

Project Complete:  452.5 total hours

Begin Daily Project Logs

May 5, 2023

Further 93

Friday

The day after applying the gloss paint, I removed the masking tape and settled in to wait another day for the paint to cure sufficiently.

After an additional days’ wait, and with the paint now sufficiently cured, I continued by masking over the fresh white paint, following the line, and preparing the field with a light sanding to remove the fine overspray from the centermost section.  After cleanup, I prepared a batch of nonskid paint to match that which I’d used on the rest of the boat, and, over the course of the day, applied two coats:  one first thing in the morning (first two photos), and the second later in the day (second pair of photos).

The second coat had cured enough after a little while that I pulled the masking tape.  Now, all that remained to complete the hatch was to install the latches (on hand) and paint the underside.

Total time billed on this job today: 1 hour

0600 Weather Observation: Mostly cloudy, 45°, dew point 39°. Forecast for the day: Cloudy with eventual clearing, 59°