Further, a 1975 Ericson 35

Schedule:

Project Schedule:  December 2022 – May 2023

Project Scope: Hull and deck paint, structural repairs, and miscellany

Project Complete:  452.5 total hours

Begin Daily Project Logs

April 26, 2023

Further 88

Wednesday

Continuing work on the hatch, I sanded the latest patches of fairing compound smooth as needed, then, with no significant fairing work remaining, sanded the entire piece through the grits to 120 to prepare for primers.

Later, over the course of the rest of the day, I applied three coats of epoxy high-build primer to the hatch, using a small disposable sprayer.

Total time billed on this job today: 2 hours

0600 Weather Observation: Cloudy, drizzle, 41°, dew point 40°. Forecast for the day: Patchy drizzle, mostly cloudy, 52°