Further 84

Boat:

Further, a 1975 Ericson 35

Schedule:

Project Schedule:  December 2022 – May 2023

Project Scope: Hull and deck paint, structural repairs, and miscellany

Project Complete:  452.5 total hours

Begin Daily Project Logs

April 6, 2023

Further 84

Thursday

After lightly sanding the cured core in the new cockpit hatch, I applied some thickened epoxy to fill flush some of the small voids still present around the edges, and used the remaining product to skim coat/wet out the surface before installing the bottom layer of 1708 over the core, overhanging it on all sides for now.  Later in the day, once the fiberglass had cured to the green stage, I trimmed off the excess with a sharp knife.

The other event of the day was the final installation of the dodger, which looked terrific and fit well.

Total time billed on this job today: 2.5 hours

0600 Weather Observation: Mostly cloudy, 34°, showers, dew point 30°. Forecast for the day: Rain and showers, 56°