February 17, 2023
Further 48
Friday
In a landmark day, I spray-applied three coats of epoxy high-build primer over the deck areas, starting with the inboard portions of the coachroof and cockpit, which areas I had to access from the nearby sidedecks, and then moving on to the main decks, cabin trunk, toerails, loose hatches and sea hood, and upper reaches of the hull-deck joint above the topsides.
Total time billed on this job today: 6 hours
0600 Weather Observation: Overcast, 39°, dew point 28°. Forecast for the day: Rain before 3 PM, then freezing rai and sleet and snow, temperature falling to 29°