March 4, 2022
Luna Mia 3
Friday
Continuing the various ongoing repairs to the hull and deck, I began with a round of sanding as necessary in all areas, starting with the hull patch at the old sail drive opening.
I continued with the sundry and small transom repairs, sanding smooth the filler I’d applied n the exterior, and lightly scuffing the new layer of fiberglass on the inside.
Next, I sanded smooth and flush the patch over the cockpit pedestal opening, and the filler on the stem.
After cleaning up and related prep and, as needed, masking, I applied epoxy fairing compound to these various areas: The hull patch; the exterior transom; the cockpit patch; and the stem.
Total time billed on this job today: 2.5 hours
0600 Weather Observation: -2°, clear. Forecast for the day: Increasing clouds, 26°