Luna Mia 18

Boat:

Luna Mia, a General Boats Rhodes 22

Schedule:

Project Schedule:  February 2022 – (Ongoing)

Project Scope: Patch and repair existing saildrive hole; hull paint; sundry minor repairs

Project Complete:  72 Total Hours

Begin Daily Project Logs

March 28, 2022

Luna Mia 18

Monday

After sanding the primer on the cockpit sole and small bow repair, I finished these projects with two coats of white nonskid paint over the course of the day.  I chose the nonskid for the bow repair as well since any patch would be highlighted in its difference, and the extra small patch of nonskid forward fit in with the overall scheme of the boat.

In between this and other, unrelated, tasks, I touched up the bottom paint over the saildrive patch, and along the waterline as needed.  This completed the work for this project.

Back to Luna Mia

Total time billed on this job today: 1.5 hours

0600 Weather Observation: 26°, overcast. Forecast for the day:  Cloudy with a chance of snow showers, 33° (actually was mostly sunny and windy)