Skeedeen Phase 6-15

Boat:

Skeedeen, a 1987 24' Crosby Striper

Schedule:

Project Schedule:  September 2020 – November 2020

Project Scope:  Hull paint; faux wood finish and relettering on transom; brightwork maintenance and other TBD

Project Complete:  144.25 Total Hours

Begin Daily Project Logs

October 15, 2020

Skeedeen Phase 6-15

Thursday

To begin, I lightly sanded the second round of fine filler as needed, completing the hull repair and fairing work.  Afterwards, I vacuumed and solvent-washed the hull.

I cleaned up and washed the floor, and then masked over the engine room vent openings from outside to prepare for painting.  At the bow, I set up some low staging to help me reach the highest points of the bow when painting.

In, around, and between this, I prepared painting equipment, paint and primer, shop lighting, and the myriad other steps needed to prepare the boat and shop for the work ahead.  Later, I solvent-washed the hull one more time, this time with the proprietary solvent designed for this use by the coatings manufacturer.

Total time billed on this job today:  3.5 hours

0600 Weather Observation:  43°, mostly clear.  Forecast for the day:  Sunny, 66°