PT11-70

Boat:

Building a PT-11 Nesting Dinghy

Schedule:

Customer Delivery for Summer 2025

Begin Daily Project Logs

March 3, 2025

PT11-70

Monday

I lightly sanded the hull with a small block sander and 320 grit, and by hand on the chines and in the corners, to prepare the surface for the third coat of hull paint.  Afterwards, I vacuumed and solvent-washed the hulls.

Later in the day, after a final tack-off, I applied the third coat of the gloss polyurethane paint.

Total time billed on this job today: 2.5 hours