PT11-62

Boat:

Building a PT-11 Nesting Dinghy

Schedule:

Customer Delivery for Summer 2025

Begin Daily Project Logs

February 7, 2025

PT11-62

Friday

After final preparations, I applied the third coat of gloss white polyurethane to the interior of the boat, stern and bow, along with another coat on the two smaller pieces–hatch cover and daggerboard trunk filler.  Again, I applied the paint with a brush, working from inside the aft half and outside the forward half.  I was pleased with how this coat turned out and hoped that it would be the final finish inside the boat.

Total time billed on this job today: 1.5 hours