August 2, 2018
Dory 4
Thursday
Once I received a replacement pad for my sander, I could turn to the exterior of the hull and sand/prep this area for the work ahead. I concentrated on the areas requiring fiberglass work, but went over the entire surface as needed to remove loose paint and otherwise prepare the surface for new work.
Total time billed on this job today: 1.5 hours