Rhodes 19

Boat:

1957 Rhodes 18, Hull #9

Schedule:

Project Complete:  67.5 Total Hours

Scope of Project:   Hull, deck, and interior surface prep and painting

Begin Daily Project Logs

August 19, 2016

Rhodes 19

< Back to Rhodes 18

Thursday

Now that the paint was cured, and I was done with spraying, I could remove all the masking tape, paper, and plastic from the boat early in the day.

Once I was back to the bare boat, I masked off the smooth deck areas to prepare the field for nonskid, as well as around the top of the hull using a special low-tack tape.

After final preparations, I applied two coats of light beige nonskid paint over the course of the day–heat and drying conditions allowed for the second coat late in the day.  This completed the main painting process and the bulk of the project.  Still to come:  project wrap-up.

First coat:

Second coat and unmasked:

Total time billed on this job today:  2 hours

0600 Weather Observation:
55°. partly cloudy.  Forecast for the day:  clouds and sun, possible shower.