Rhodes 11

Boat:

1957 Rhodes 18, Hull #9

Schedule:

Project Complete:  67.5 Total Hours

Scope of Project:   Hull, deck, and interior surface prep and painting

Begin Daily Project Logs

July 26, 2016

Rhodes 11

< Back to Rhodes 18

Tuesday

After final preparations, I spray-applied three coats of epoxy high-build primer to the hull and deck areas.  The small size of the boat allowed me to do both hull and deck concurrently, so the elapsed chore went a bit faster as a result.  I left the primer to cure the rest of the day and overnight.

Total time billed on this job today:  3.5 hours

0600 Weather Observation:
65°, foggy.  Forecast for the day:  fog lifting, sunny, high around 90