July 26, 2016
Rhodes 11
Tuesday
After final preparations, I spray-applied three coats of epoxy high-build primer to the hull and deck areas. The small size of the boat allowed me to do both hull and deck concurrently, so the elapsed chore went a bit faster as a result. I left the primer to cure the rest of the day and overnight.
Total time billed on this job today: 3.5 hours
0600 Weather Observation:
65°, foggy. Forecast for the day: fog lifting, sunny, high around 90