Rhodes 10

Boat:

1957 Rhodes 18, Hull #9

Schedule:

Project Complete:  67.5 Total Hours

Scope of Project:   Hull, deck, and interior surface prep and painting

Begin Daily Project Logs

July 20, 2016

Rhodes 10

< Back to Rhodes 18

Wednesday

The second round of fairing filler was ready for sanding, so that was my first task.  Since the area was looking good, I took it through 120 grit, completing the sanding in this area and matching the other deck areas, which were ready for high-build primer.

After cleaning up the boat with vacuum and initial solvent wash, I covered the interior of the boat with plastic sheeting to protect it from overspray.

Later, I washed down the shop floor to still the dust and remove other debris, and finished up the basic prep work by preparing primer and spray equipment, and a final solvent wash with the paint system’s proprietary solvent designed for the purpose.  With other commitments, it’d be a couple days before I could spray the primer, but everything was ready to go with minimal final preparations.

Total time billed on this job today:  3 hours

0600 Weather Observation:
50°, clear.  Forecast for the day:  sunny, low 80s