Snow Lily | Thursday, March 14, 2013

One of the little tasks remaining was to paint the patches on the bottom, including the new work around the stern tube extension and the places where the boat had been resting on jackstands.  When I moved the boat earlier, I placed the stands in different locations to keep the bare patches exposed for this purpose.

Over the course of the day, working the coats in between other work going on, I applied several coats of epoxy barrier coat, and two coats of bottom paint to these areas.


         

         


Back inside, I spent a good portion of the day installing "baseboard" trim around the cabin sole to complete the job.  I cut the trim to fit all around the perimeter of the sole, securing it with brads and glue as needed.

        

         

    

Afterwards, I masked off the trim against the adjacent cabinetry, then lightly sanded the sole and trim before applying the next coat of varnish.

         

         
 


Total Time on This Job Today:  8.25 hours