With the usual round of water-wash and light sanding, I prepared the battery support structure for its final tabbing.    After cleaning up, I installed two layers of biaxial tabbing to secure the structure in the areas I'd created the fillets--the forward and after ends, plus the middle.


         


Afterwards, I worked for a while on some of the cabinet door details and other odds and ends, finishing up the installation of door catches on some of the saloon doors, and gluing in the support blocks required for the catches on the upholstered backrest doors.  I'd hoped to get a little more done, but a meeting I'd scheduled ran long, cutting into the remaining time I'd planned for the afternoon.

    


Total Time on This Job Today:  3.25 hours