110 Cookson Lane | Whitefield, ME 04353 | 207-232-7600 | tim@lackeysailing.com |
Home | Contact Lackey Sailing | Conversion Projects | Project Logs | Tim's Projects | Flotsam |
Ensign #1212 | Wednesday, July 30, 2014 Keeping the varnish work going, I sanded and varnished again, this time the fifth coat on the cabin doors (inside) and vents, and seventh coat on the starboard seat slats (top side). |
Back onboard, I prepared the openings for the large poop deck hatch and a smaller access port in the short vertical bulkhead behind the tiller, and installed the new hatches with new fasteners and sealant. |
|
I moved on to the foredeck, where I installed the mooring cleat with a new fiberglass backing plate and large washers. Then, I installed the deck plate just aft of the cleat. |
|
Moving forward, I installed the bow chocks and, afterwards, the last deck plate. In all cases, I prepared for installation in the usual way, with drilled and tapped fastener holes, milled countersinks at the deck surface at each location, and plenty of sealant. |
|
Afterwards, I moved operations back to the cockpit and set up for the final stages of hardware installation on the cabin trunk and cockpit sidedecks. For the moment, I was out of time. |
|