Ashantee
| Friday, February 13, 2015

Another round of sanding in the interior finished up work on the various patches and hole-filling that I'd been working on. 


         

         



With the end of major prep work for the interior and exterior painting projects, I began the thorough cleaning process of boat and shop required.  Over the past few days I'd been considering in which order I wanted to attack the painting projects, and ultimately decided to complete the overhead first before moving to the decks and hull.  So to that end, I focused cleanup efforts on the cabin for now, as I could continue work outside even during the interior painting process.  After vacuuming up the dust from everywhere, I solvent-washed the overhead to prepare it for primer.

Because fresh epoxy laminates can prevent one-part paints from curing properly, I applied some epoxy 2-part primer over the new bulkhead patch, which would allow the cabin primer to cure properly over top.

         

         


Cleanup and preparations complete for now, I wrapped up the day with the coaming blanks.  After overlaying the two coamings on their respective pairs of new teak boards to reassure myself that the blanks were correctly sized, I glued each pair of boards together with epoxy, clamping them securely and eventually setting them aside in the shop for plenty of cure time.

         
 


Total Time Billed on This Job Today:  5.75
Hours