Skeedeen 6

Boat:

Skeedeen, 1987 Crosby Striper

Schedule:

Project Complete:  98.25 Total Hours

Scope of Project:   Brightwork maintenance; Refinish Nonskid; Miscellaneous Seasonal Maintenance

Begin Daily Project Logs

October 27, 2018

Skeedeen 6

Saturday

I lightly sanded the new epoxy over the fastener hole patches on the cabin trunk and elsewhere, smoothing the excess.  This revealed various low spots requiring additional fairing compound.

As needed, I added a second coat of the epoxy fairing compound to all areas.

Total time billed on this job today:  0.5 hours

0600 Weather Observation:  33°, clouds.  Forecast for the day:  Cloudy and then rain, possibly with snow or a mix, and windy, around 40°