Patience 13

Boat:

Patience, 1985 Laser 28' Sloop

Schedule:

Project Complete:  51.25 Total Hours

Scope of Project:   New boottop and striping; replace halyard stoppers; new cabin sole; miscellaneous maintenance projects (Phase II)

Begin Daily Project Logs

June 6, 2016

Patience 13

< Back to Patience

Monday

Preparing for another project, and now that the bottom paint had had the weekend to cure, I moved Patience back outdoors to await her departure for the water in  a few weeks.  I thought the new striping looked terrific, and really made a difference to the boat’s appearance.

I offset the jackstands from the original locations so I could patch in the bottom paint, which I took care of once the boat was set.

< Back to Patience