Dyer 4

Boat:

1979 8' Dyer Dhow

Schedule:

Project Complete:  20 Total Hours

Brightwork, install new rubrail, and miscellaneous repairs

Begin Daily Project Logs

October 18, 2017

Dyer 4

< Back to Dyer

Wednesday

After a light sanding and cleanup, I applied a second coat of varnish to all areas in the boat.

The spars for the sailing rig, along with the oars, rudder, and daggerboard, were in  generally good condition and appeared little-used.  The brightwork on these items was in sound condition and required only maintenance coats of varnish going forward.

After removing the tiller and lightly sanding the rudder, I found a crack in the wood near the top, so I made a small repair with epoxy and clamps.

I lightly sanded the spars, oars,  and other pieces, then applied a coat of varnish to them all.

Total time billed on on this job today:  4 hours

0600 Weather Observation:  Clear, 34°.  Forecast for the day:  sunny, upper 60s