Waanderlust Project | Friday, October 8, 2010

With windy conditions outdoors, I installed the tarp while the boat was still inside the shop, securing the tarp with a few lines to hold things temporarily.  Unfortunately, this precluded the chance to take pictures of the boat as she emerged from indoors.

Afterwards, I moved the boat to her designated spot in the yard for storage, and completed the tarp tie-down with a number of lines anchored to the ground, plus several cross lines beneath the boat which help hold the tarp down.

Phase I of the project was now complete.  Phase II will begin later  on; the exact timing will be determined soon


    


Total Time Billed on This Job Today:  2 hours