110 Cookson Lane | Whitefield, ME 04353 | 207-232-7600 | tim@lackeysailing.com |
Home | Contact Lackey Sailing | Conversion Projects | Project Logs | Tim's Projects | Flotsam |
Khasanah | Friday, March 15, 2013 The owner brought the boat to me with a list of possible projects to accomplish, depending on the overall scope of a few larger problems. Among the more significant possibilities was the possibility, according to a recent survey, of core damage in parts of the deck, particularly the coachroof. After allowing the boat to warm up for the better part of a week, I spent some time going over her in detail to assess the actual scope of or need for work on the items on the list. During my inspection, I determined that the coachroof core was indeed compromised and badly deteriorated, so I suspected that the need for this repair would drive the final outcome of some of the other items on the list. I prepared a report for the owner so we could determine the final project scope. As we move forward, I'll cover the various jobs at hand, once the scope has been finalized. |
|