Iota Refit | Monday, March 24, 2008

Seth from Mobile Canvas was due tomorrow to template the dodger, so to prepare for him I temporarily installed the coamings, which he'd need in place.  I still had 1-2 coats to apply to each side of the coamings before final installation, but knowing Seth was due I'd stopped varnishing last Friday to give the finish plenty of time to cure before he needed to tape onto the coamings for his template.

While I was at it, I installed the piano hinges and latches for the cockpit lockers.

Even without their final finish, the coamings always transform a Triton.

    


Total time on woodworking projects today: 1 hour; 1hour on hardware

<Previous | Next>