Iota Refit |
Saturday, March 22, 2008 With the epoxy in the oversized holes cured, I drilled through the deck for the mounting screws and then installed the sea hood in a bed of sealant, using #12 screws driven from beneath. I omitted the sealant in way of the four limbers. |
I spent the rest of the day installing much of the remaining hardware, including the mast step, forward cowl vent, bow chock, genoa tracks, working jib tracks, and traveler. |
<Previous | Next>
|