110 Cookson Lane | Whitefield, ME 04353 | 207-232-7600 | tim@lackeysailing.com |
Home | Contact Lackey Sailing | Conversion Projects | Project Logs | Tim's Projects | Flotsam |
Ashantee | Friday, February 27, 2015 Next, I wanted to wrap up the high-build work on the hull, so to that end I vacuumed and solvent washed the hull and, as needed, applied fine epoxy fairing compound to fill small voids and the like, along with the loose locker lids. |
|
|