110 Cookson Lane | Whitefield, ME  04353 | 207-232-7600 |  tim@lackeysailing.com

Home  Contact Lackey Sailing  |  Conversion Projects  |  Project Logs  |  Tim's Projects  |  Flotsam

Ashantee
| Friday, February 27, 2015

Next, I wanted to wrap up the high-build work on the hull, so to that end I vacuumed and solvent washed the hull and, as needed, applied fine epoxy fairing compound to fill small voids and the like, along with the loose locker lids. 


         

         

    

      



Total Time Billed on This Job Today:  2.25
Hours

<Previous | Next>